Advertisement for Bids

MCE offers a service of allowing users the opportunity to receive automatic updates of "Notice of Projects Bidding and Bid Results". This service is in NO WAY intended to replace the "Public Notice for Bid" process or "Certified Bid Tab Results". The user of these files should verify all information with the Project Engineer listed at MCE. All information listed on these files are updated on a regular basis but can contain errors/emissions. Once again the following files are for GENERAL USE ONLY.

Dewitt Municipal Airport Fuel Farm

The City of Dewitt, Arkansas will receive sealed bids on a General Contract to install a 3,000 gallon above ground fuel system equipped for aviation use and with a self-service credit card system.

The engineer's estimate for this job is $61,000.00.


View Bid Details
Job: LR09-5790
Plan Price: $25
Bid Date: Wednesday March, 17th 2010 11:00am
Bid Location: City Hall, Dewitt, AR
Purchase Plans: McClelland Consulting Engineers, Inc.
Project Engineer: Matthew Vinyard
Contact Phone: (501) 371-0272
Documents:
Advertisement for Bid
Dewitt Municipal Airport Fuel Farm
Plans Holders
Dewitt Municipal Airport Fuel Farm
Benton - FEMA Mitigation Phase III

Benton Utilities, Benton, Arkansas will receive sealed bids on a General Contract for work consisting of but not limited to dredging of the Saline River Water Intake area.  A weir is located downstream from the excavation.  The deepest part of the existing channel is 4 to 8' below the top of the weir.  The bottom of the completed channel will be 10.22' below the top of the weir.  The work includes excavation and offsite disposal of approximately 4,424 cubic yards of unclassified material.  The excavated area will be approximately 386' long and have a 50 to 63' bottom width with 1V:3H side slopes.  Excavation limits may be decreased as required to stay within available funds.  Excavated material shall be disposed of offsite at a location provided by the Owner.

NOTE: A pre-bid meeting will be held at 11:00 a.m. on March 24, 2010 at Benton Utilities, 1827 Dale Avenue, Benton, Arkansas.  Attendance at the pre-bid meeting is not mandatory, but all prospective bidders are encouraged to attend.

The engineer's estimate for this job is $447,000.00.


View Bid Details
Job: LR08-5737C
Plan Price: $35
Bid Date: Wednesday March, 31st 2010 2:00pm
Bid Location: Benton Utilities, Benton, AR
Purchase Plans: McClelland Consulting Engineers, Inc.
Project Engineer: Robert Young
Contact Phone: (501) 371-0272
Documents:
Advertisement for Bid
Benton - FEMA Mitigation Phase III
Plans Holders
Benton - FEMA Mitigation Phase III
Dardanelle - Water Treatment Plant Expansion

The City of Dardanelle, Arkansas will receive sealed bids on a General Contract for the expansion of their 3 MGD water treatment plant to 5 MGD.

The engineer's estimate for this job is $4,000,000.00.


View Bid Details
Job: LR08-5714
Plan Price: $200
Bid Date: Wednesday March, 10th 2010 2:00pm
Bid Location: City Hall, Dardanelle, AR
Purchase Plans: McClelland Consulting Engineers, Inc.
Project Engineer: Brad Wingfield
Contact Phone: (501) 371-0272
Documents:
Advertisement for Bid
Dardanelle - Water Treatment Plant Expansion
Addendum
Dardanelle - Water Treatment Plant Expansion - Addendum #1
Dardanelle - Water Treatment Plant Expansion - Addendum #2
Dardanelle - Water Treatment Plant Expansion - Addendum #3
Plans Holders
Dardanelle - Water Treatment Plant Expansion